AutoNetUSA › Paul Miller BMW › 2027 BMW M5
2027 BMW M5
1 / 18 · ⛶ expand

2027 BMW M5

· Sedan
MSRP$134,825
Doc Fee$995
Paul Miller Price$135,820
Price excludes tax, title, registration. Doc fee shown above.
Price and availability from Paul Miller BMW’s own listing as of Oct 31 — vehicles can sell or move at any time; confirm final price and availability with the dealer.
View at Paul Miller BMW →
Establishing this vehicle’s Google entity

Pricing, availability, and equipment can change at any time. Please confirm all details directly with Paul Miller BMW.

Specifications

Engine4.4L V-8 cyl
TransmissionAutomatic
DrivetrainAll-Wheel Drive
FuelPlug-In Hybrid
ExteriorBrooklyn Grey Metallic
InteriorRed Black
BodySedan
Doors4
Conditionnew
Stock #VCZ04700
VINWBS83FK09VCZ04700

Features & options

M Carbon Exterior PackageBMW Iconic Glow Kidney GrilleFront and Rear Heated SeatsInterior CameraParking Assistant PlusDriving Assistant ProfessionalTraffic Jam AssistantLane Change AssistantPartial Automated DrivingPower rear sunshade & rear side window shadesFront ventilated seatsParking View with 3D View (SurroundView)Red/Black Extended Merino LeatherBrooklyn Grey MetallicULEV70 exhaust emissions standard20/21 M Dual-Spoke Bicolor Black 952M Wheels with Staggered Performance TiresM Drive ProfessionalHeated Steering WheelTire pressure monitorMobility KitAlarm SystemUniversal garage-door openerComfort Access keyless entryM Compound Brakes with Red CalipersM Shadowline LightsCarbon Fiber Silver Thread High Gloss Trim with Dark Silver AccentPower Front SeatsTravel and Comfort SystemM Seat BeltsMulti-function seats with lumbar support4-zone automatic climate controlFlexible Fast ChargerAcoustic protection for pedestriansAmbient LightingIconic Sounds ElectricAdaptive Full LED LightsDecoding for no-dazzle high-beam assistanceEmergency trunk releaseNEMA 5-15/14-50 Adapter BundleRadio control USSiriusXM Satellite Radio with 1-year All Access SubscriptionBMW Assist eCallBMW TeleServicesConnectedDrive ServicesConnected Package Pro Limited TermBowers and Wilkins Surround SoundWireless Device ChargingPersonal eSimHead-up DisplayShadowline exterior trimAnthracite Alcantara HeadlinerExtended Shadowline TrimHot climate versionCold climate versionSupplement tank fillingLanguage Version EnglishUS Charging socketOil Chg 10,000 mls/12 monthsRefrigerantVisible chassis number

About this vehicle

Is this 2027 BMW M5 your perfect car? Contact Paul Miller BMW to see this Brooklyn Grey Metallic Sedan available for $135820