AutoNetUSA › Jack Hanania Buick GMC › 2026 BMW M4 Competition xDrive
2026 BMW M4 Competition xDrive
1 / 37 · ⛶ expand

2026 BMW M4 Competition xDrive

Competition xDrive · Coupe
Price$85,777
Dealer Fees$1,428
Sale Price$87,205
Price and availability from Jack Hanania Buick GMC’s own listing as of Oct 31 — vehicles can sell or move at any time; confirm final price and availability with the dealer.
View at Jack Hanania Buick GMC →
◆ What Google Sees →
⛽ EPA Fuel Economy & Range ratings ↓🛡️ NHTSA Safety ratings & Recalls ↓

Pricing, availability, and equipment can change at any time. Please confirm all details directly with Jack Hanania Buick GMC.

Specifications

Engine3L i-6
TransmissionAutomatic
DrivetrainAWD
FuelGasoline
Mileage13,500 mi
ExteriorGreen
InteriorSilver
BodyCoupe
Doors2
Conditionused
Stock #TCV75108T
VINWBS33HK05TCV75108

Full Specifications · the 2026 BMW M4 spec sheet

Horsepower523 hp @ 6,250 rpm
Torque479 lb-ft @ 2,750 rpm
EngineTwin Turbo Premium Unleaded I-6
Transmission8-speed automatic
Drivetrain4WD
Fuel systemGasoline Direct Injection
MPG16 city / 22 to 23 highway
Seating4
Body styleLuxury car
Annual fuel cost (EPA)$4550/yr
EPA GHG score3 / 10
MPG combined (EPA)18 combined
5-year fuel cost vs. average (EPA)$10,750 more in fuel over 5 years vs. the average new vehicle
Curb weight3830 lbs
Cargo volume10.6 to 12 ft³, 12 to 13.6 ft³ with seat area
Dimensions189″ L x 74″ W x 55″ H
Wheelbase112.5 in
Length189.1 in
Width74.3 in
Height54.8 in

About this vehicle

Is this 2026 BMW M4 your perfect car? Contact Jack Hanania Buick GMC to see this Green Competition xDrive Coupe available for $88005

Fuel Economy & EnvironmentGasoline Vehicle · U.S. EPA estimates
18
MPG combined
16
MPG city
22 to 23
MPG highway
$4550
Annual fuel cost
3/10
Greenhouse gas rating
$10,750 more in fuel over 5 years vs. the average new vehicle
Source: official U.S. EPA data · fueleconomy.govRanges reflect the model’s EPA-tested configurations; actual results vary.View this model’s full EPA label →
Safety & Recalls2026 BMW M4 · U.S. DOT / NHTSA data
1 open recall campaign for this model — repairs are performed at no charge to the owner.
  • ELECTRICAL SYSTEM · NHTSA 25V643000
Schedule your vehicle’s recall appointment at Jack Hanania Buick GMC →
📍 2255 US-1, St. Augustine, FL 32086, USA📞 (904) 494-6722
VIN-specific completion status is confirmed at the dealer.
Source: official NHTSA data · nhtsa.gov · model-level; ratings shown for the primary tested configuration.